Sunray Shores Water System

Sunray Shores Water System
Project Status:Closed
Project Location:Belmont, NH
General Bids Due:August 12, 2024 at 2:00 PM
Bid Opening Location:Horizons Engineering, Inc. 34 School Street, Littleton NH
Project Owner:Sunray Shores Water District
Engineer's Estimate:$1,235,300
Description:Drinking Water Pump Station, Storage, Transmission and Distribution Main
Pre-Bid Conf. Date:July 24, 2024 at 11:00 AM
Pre-Bid Conf. Location:Existing Pump House Location, Pond Street (near intersection with Elaine Drive), Belmont, New Hampshire 03220
Project Engineer:Matt Graber
Project Number:220963
Addendum:View/Download

Please fill out the following form and a link to the digital specs and plans will be emailed to you.

Plan Holders:

Addendum #1 Issued on July 29, 2024 

Addendum #2 Issued on July 30, 2024 

Addendum #3 Issued on August 5, 2024 